Earthquake 9070300 User Manual Page 16

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 15
Operator’s Manual
Chipper Shredders
16 Check for parts online at www.getearthquake.com or call 800-345-6007 M-F 8-5
Maintenance
Schedule & Procedures
The following schedule should be followed for normal care of your unit.
* Refer to engine owner’s manual. Change original engine oil after initial break-in period of 5-8 hours.
** More often in hot (over 85° F: 30° C) weather or dusty operating conditions.
SAFETY ITEMS Before
Each
Use
Every 5
Hours
Every 25
Hours
Every 100
Hours
Every
250
Hours
Spring &
Fall
Check for loose hardware X X
Check all safety labels X
Inspect cone, hopper, and guards. X
CHIPPER MAINTENANCE ITEMS Before
Each
Use
Every 5
Hours
Every 25
Hours
Every 100
Hours
Every
250
Hours
Spring &
Fall
Clean debris from engine and chipper. ** X X
 X
 X
ENGINE MAINTENANCE ITEMS Before
Each
Use
Every 8
Hours
Every 25
Hours
Every 50
Hours
Every
100
Hours
Spring &
Fall
Check Engine Oil Level * X X
Change Engine Oil * ** X
 X
Replace Spark Plug * X
Check for Loose Hardware
Service Interval: Every 5 hours; every spring and fall.
Inspect the unit, checking for loose hardware or components.
Pay special attention to the hardware attaching the chipper
cone, hopper, axle, and front leg.
Check Safety Labels
Service Interval: Every spring and fall.
Check that the safety labels are in place and undamaged.
Sample illustrations and part numbers of the decals can be
found on page 6. Replace any damaged or missing decals.
Inspect Cone, Hopper, & Guards
Service Interval: Every spring and fall.
Check that the chipper cone, shredder hopper, and discharge
guards are in place, undamaged, and secure. Replace any
damaged or missing parts.
Page view 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 39 40

Comments to this Manuals

No comments